(This page is best viewed with CSS style sheets enabled)
»
| Ref |
Type |
Month |
Description |
| D1.1.1 | Report | 3 |
Definition of terms & Description of Background Technologies
Archive (Parts I & II)
|
|
D1.2.1 | Report + sw | 4 |
Collection of benchmarks.
Archive (Parts I,II,III) -
Archive (Software)
|
| D1.2.2 | Report | 6 |
Assessment of background technologies
Archive (Parts I,II,III)
|
| D6.1.1 | Report +review | 6 |
1st Six-Monthly Progress Report
Archive (Report) -
Archive (1st EC Review, 7 Jul 1998) -
Archive (Reviewers' Reports)
|
| D7.1.1 | Report | 6 |
Initial exploitation plan
Archive
|
| D1.3.1 | Report | 12 |
General requirements for tools and aspects in COSY
Archive (Part I, II, III)
|
|
D1.4.1 | Report | 12 |
Spec. of supported architecture template
Archive
|
|
D1.5.1 | Report | 12 |
Spec. of extensions to Felix (functional and system design level)
Archive
|
|
D1.6.1 | Report | 12 |
Spec. of extensions to TSS (architectural design level)
Archive
|
|
D1.6.2 | Report | 12 |
Spec. of FSMD synthesis (Ugh)
Archive
|
|
D1.7.1 | Report | 12
|
Spec. of Fast Prototyping Platform
Archive
|
|
D1.8.1 | Report | 12
|
Spec. of DVB demonstrator (digital video)
Archive
|
|
D1.9.1 | Report | 12
|
Spec. of SMC demonstrator (industrial control)
Archive
|
| D6.1.2 | Report +review | 12 |
2nd Six-Monthly Progress Report
Archive (Report)
|
| Ref |
Type |
Month |
Description |
| D1.10.1 | Report | - |
Guidelines for modelling tools and aspects of COSY (used for specification tasks).
Cancelled, merged into D1.10.2 |
|
D1.10.2 |
Report |
15 |
General specifications of COSY. This reports includes a formal model of COSY (the "COSY diagram") and concludes the work in WP 1. |
|
D7.2.1 |
Work -Shop |
16 |
First COSY workshop. This workshop, open to OMI community, will present the general specification of COSY, fostering potential cooperation with other groups/projects |
|
D7.1.2 |
Report |
18 |
Intermediate exploitation plan |
|
D2.1.1 |
Tool |
22 |
Software-estimation environment (time-approximate simulation + processor model) |
|
D2.1.2 |
Tool |
23 |
Cosimulation environment |
|
D2.2.1 |
Tool |
23 |
Cycle-accurate simulation environment |
|
D2.3.1 |
Tool |
23 |
Fast-prototyping platform (board + tool) |
|
D3.1.1 |
Tool |
23 |
Software-synthesis tool (code and RTOS configuration from the combined control/dataflow specification) |
|
D3.2.1 |
Tool |
23 |
DSP-synthesis (including system-level constraint) |
|
D3.2.2 |
Tool |
23 |
FSMD-synthesis (for control-dominated coprocessors) |
|
D3.3.1 |
Tool |
23 |
Mapping environment for Fast Prototyping platform |
|
D4.1.1 |
Tool |
23 |
2 module generators for PI-Bus controllers (Bus Control Unit and Interrupt controller) |
|
D4.2.1 |
Tool |
23 |
2 module-generators for PI-Bus interfaces (slave and master) |
|
D5.1.1 |
Tool |
27 |
Integration of tools for the DVB demonstrator |
|
D5.1.2 |
Demo |
29 |
Field Trial of the generic DVB platform |
|
D5.2.1 |
Demo |
29 |
SMC demonstration |
|
D7.1.3 |
Report |
30 |
Final exploitation plan |
|
D7.2.2 |
Work -Shop |
30 |
DAC/COSY special session and marketing activity based on the final exploitation plan (note the DAC session is scheduled in June after the official end of the project) |